Work on Sewer Here to be Started Soon

Publication
Lake Shore News (Wilmette, Illinois), 30 Apr 1914, p. 1
Description
Full Text

Work probably will be started on the Wilmette end of the new north shore intercepting sewer next week, providing all of the water mains, which are being changed to the opposite side of the street in Sheridan road and other streets through which the new sewer will be built, are in place. The R. J. McNichols COnstruction company has all of its equipment at the drainage channel and practically all of the track laid in the streets through which the sewer will be dug for the dinky engines and dirt trains to operate upon.
A [unclear] published in a Chicago paper that the village officials had prohibited the construction company from placing the temporary narrow-gage track in Sheridan road, was erroneous in every detail. The equipment is all in readiness and the first shovel of earth on this section of the sewer work probably will be dug within a short time. Both Sheridan road and Third street north of Central avenue have been closed to traffic while the work is being done.


Featured Link
Media Type
Newspaper
Item Types
Articles
Clippings
Notes


Date of Publication
30 Apr 1914
Subject(s)
Local identifier
Wilmette.News.299396
Language of Item
English
Copyright Statement
Copyright status unknown. Responsibility for determining the copyright status and any use rests exclusively with the user.
Contact
Wilmette Public Library
Email:refdesk@wilmettelibrary.info
Website:
Agency street/mail address:
1242 Wilmette Avenue
Wilmette, IL
60091-2558
U.S.A. Phone: 847-256-6930
Powered by / Alimenté par VITA Toolkit
Privacy Policy